Beta Test Plan Modifications
These are the changes we need in the test plan for phase beta:
- New recording control parameters or setup procedures for EDR3 and SAVER. Need to obtain
from Lansmont and IST, taking into account the experiences with phase alpha.
- Recording unit orientation: position units so that front of unit is front of package,
etc.
- Changes in shipment form as attached.
- New Instruction for senders.
- Dimensions and weight for next rounds (30 Lbs, 40 Lbs?, Sizes?.) Dimensions and weight
for the 20 Lbs. .
- New drawing - add support bar.
Beta Test Block